LEGO Designer:
Adam Wilde (Apollo 110)
Designed:
June 2022
Categories:
All, Moon, Probes and Satellites, Space Agency - NASA
Between August 1966 and August 1967 the five identical, uncrewed Lunar Orbiter spacecraft successfully mapped 99% of the lunar surface, the first three missions surveying potential Apollo landing sites. It ran more or less concurrently with the Surveyor program, and Surveyor 1 is even visible in one of the frames taken by Lunar Orbiter 3.
The base is modelled on a section of a photo taken by Lunar Orbiter 1 (frame 1007).
Part count: bricks, lots.
Unit | width | length | height |
---|---|---|---|
Studs | |||
Inches | |||
Centimetres |
No external URL provided.
Launch History information from space.skyrocket.de
Launch History information from space.skyrocket.de
Related Posts
None found